02 · Builders and general contractors
Piers that stay out of the concrete's waiting time.
New houses, additions, sunrooms, decks, and metal buildings are all in the owner's published articles. The pier does not cure. The rest of the building still follows the structural drawings and the inspections.
What helps before mobilization
- Plans, even if the reactions are still preliminary.
- A geotechnical report, if one exists. A county soil story is not a boring.
- Flood zone from the survey, if the survey states it.
- Access: gate width, floor height, trees, tides, and whether the house is occupied.
- Deck and addition loads kept separate from the main house.
The existing site's published typical pace is about a day for a new-home array and 1 to 3 days for a residential underpinning. Bid the job you have, not the typical.